FCC ID: A3LSMT975 Tablet

by: Samsung Electronics Co Ltd latest update: 2020-08-18 model: SMT975

Seven grants have been issued under this FCC ID on 08/18/2020 (this is one of seven hundred and seventy-two releases in 2020 for this grantee). Public details available include frequency information, manuals, and internal & external photos. some products also feature user submitted or linked password defaults, drivers, instructions, troubleshooting guides, & warrantee terms.
permalink for this FCC identifier
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 User manual Users Manual pdf 2.92 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Internal photos Internal Photos pdf 397.27 KiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 External photos External Photos pdf 2.29 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Label format and location ID Label/Location Info pdf 341.82 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Agent authorization Cover Letter(s) pdf 458.32 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Antenna location and specification Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Block diagram Block Diagram pdf July 16 2020 confidential
1 2 3 4 5 6 7 Corner sensor KDB Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Dynamic Antenna Tuning Operational Description(manual) Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Dynamic Antenna tuning KDB Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 E-label Attestation Letter Attestation Statements pdf 250.79 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 LTE R10 Checklist Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 MPR Attestation letter for LTE Attestation Statements pdf 198.74 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 MPR Attestation letter for UMTS Attestation Statements pdf 188.84 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Operational Description (MainRF) rev Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Parts list Parts List/Tune Up Info pdf July 16 2020 confidential
1 2 3 4 5 6 7 Request for confidentiality Cover Letter(s) pdf 414.20 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 1 of 4 RF Exposure Info pdf 4.72 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 2 of 4 RF Exposure Info pdf 5.59 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 3 of 4 RF Exposure Info pdf 5.57 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 4 of 4 RF Exposure Info pdf 374.56 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test setup photos Test Setup Photos pdf 1.30 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Schematics Schematics pdf July 16 2020 confidential
1 2 3 4 5 6 7 Sensor Triggering Distance rev2 Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Test Report (Part 22) (Part 1) rev Test Report pdf 3.94 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 22) (Part 2) rev Test Report pdf 5.07 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 24) (Part 2) rev Test Report pdf 4.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 24) (Part 3) rev Test Report pdf 4.52 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 27) (Part 1) rev2 Test Report pdf 4.73 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 27) (Part 2) rev2 Test Report pdf 3.35 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 27) (Part 3) rev2 Test Report pdf 5.42 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 90) rev Test Report pdf 3.99 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test setup photos Test Setup Photos pdf 464.61 KiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Tune up procedure Parts List/Tune Up Info pdf July 16 2020 confidential
1 2 3 4 5 6 7 Volume scan KDB Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Test report Test Report pdf 1.83 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Operational description Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 Test report 1 of 2 Test Report pdf 5.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test report 2 of 2 Test Report pdf 2.82 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Tune up power table Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 RF200522K003-6 R1 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part1 rev2 Test Report pdf 5.27 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R1 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part2 rev2 Test Report pdf 5.20 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R1 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part3 rev2 Test Report pdf 5.17 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part4 rev2 Test Report pdf 5.31 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part5 rev2 Test Report pdf 5.25 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part6 rev2 Test Report pdf 5.44 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part7 rev2 Test Report pdf 5.16 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part8 rev2 Test Report pdf 5.31 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part9 rev2 Test Report pdf 5.06 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co.,Ltd. SM-T975 P15.407 U-NII Part10 rev2 Test Report pdf 3.32 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part1 Test Report pdf 5.35 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part10 Test Report pdf 4.99 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part11 Test Report pdf 5.28 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part12 Test Report pdf 5.38 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part13 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part14 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part15 Test Report pdf 5.01 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part16 Test Report pdf 5.04 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part17 Test Report pdf 5.07 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part18 Test Report pdf 5.01 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part19 Test Report pdf 5.05 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part2 Test Report pdf 5.33 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part20 Test Report pdf 5.14 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part21 Test Report pdf 5.20 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part22 Test Report pdf 4.96 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part23 Test Report pdf 4.86 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part24 Test Report pdf 4.99 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part25 Test Report pdf 5.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part26 Test Report pdf 5.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part27 Test Report pdf 5.26 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part28 Test Report pdf 2.63 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part5 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part6 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part7 Test Report pdf 4.85 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part8 Test Report pdf 4.91 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part9 Test Report pdf 4.84 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Software Operational Description SDR Software/Security Inf pdf July 16 2020 confidential
1 2 3 4 5 6 7 BLE test report Test Report pdf 4.25 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-3 R1 Samsung Electronics Co., Ltd. SM-T975 P15.247 2.4 GHz WLAN OFD Test Report pdf 2.61 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SM-T975 P15.247 2.4 GHz WLAN Part1 rev2 Test Report pdf 5.42 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SM-T975 P15.247 2.4 GHz WLAN Part2 rev2 Test Report pdf 3.95 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Set Up Photos (Part 15B CXX) rev2 Test Setup Photos pdf 431.13 KiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Test report-1 Test Report pdf 2.07 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test setup photos (JBP) Test Setup Photos pdf 5.61 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 RF exposure test report RF Exposure Info pdf 252.64 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SA200619C19 (RF Exposure WPT TSup Photo) Rev.1 Test Setup Photos pdf 1.02 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 WPT KDB Operational Description pdf July 16 2020 confidential
1 2 3 4 5 6 7 User manual Users Manual pdf 2.92 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Internal photos Internal Photos pdf 397.27 KiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 External photos External Photos pdf 2.29 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Label format and location ID Label/Location Info pdf 341.82 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Agent authorization Cover Letter(s) pdf 458.32 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 E-label Attestation Letter Attestation Statements pdf 250.79 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 MPR Attestation letter for LTE Attestation Statements pdf 198.74 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 MPR Attestation letter for UMTS Attestation Statements pdf 188.84 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Request for confidentiality Cover Letter(s) pdf 414.20 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 1 of 4 RF Exposure Info pdf 4.72 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 2 of 4 RF Exposure Info pdf 5.59 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 3 of 4 RF Exposure Info pdf 5.57 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test report 4 of 4 RF Exposure Info pdf 374.56 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SAR test setup photos Test Setup Photos pdf 1.30 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Test Report (Part 22) (Part 1) rev Test Report pdf 3.94 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 22) (Part 2) rev Test Report pdf 5.07 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 24) (Part 2) rev Test Report pdf 4.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 24) (Part 3) rev Test Report pdf 4.52 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 27) (Part 1) rev2 Test Report pdf 4.73 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 27) (Part 2) rev2 Test Report pdf 3.35 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 27) (Part 3) rev2 Test Report pdf 5.42 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Report (Part 90) rev Test Report pdf 3.99 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test setup photos Test Setup Photos pdf 464.61 KiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Test report Test Report pdf 1.83 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test report 1 of 2 Test Report pdf 5.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test report 2 of 2 Test Report pdf 2.82 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R1 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part1 rev2 Test Report pdf 5.27 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R1 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part2 rev2 Test Report pdf 5.20 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R1 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part3 rev2 Test Report pdf 5.17 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part4 rev2 Test Report pdf 5.31 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part5 rev2 Test Report pdf 5.25 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part6 rev2 Test Report pdf 5.44 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part7 rev2 Test Report pdf 5.16 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part8 rev2 Test Report pdf 5.31 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co., Ltd. SM-T975 P15.407 U-NII Part9 rev2 Test Report pdf 5.06 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-6 R2 Samsung Electronics Co.,Ltd. SM-T975 P15.407 U-NII Part10 rev2 Test Report pdf 3.32 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part1 Test Report pdf 5.35 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part10 Test Report pdf 4.99 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part11 Test Report pdf 5.28 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part12 Test Report pdf 5.38 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part13 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part14 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part15 Test Report pdf 5.01 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part16 Test Report pdf 5.04 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part17 Test Report pdf 5.07 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part18 Test Report pdf 5.01 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part19 Test Report pdf 5.05 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part2 Test Report pdf 5.33 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part20 Test Report pdf 5.14 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part21 Test Report pdf 5.20 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part22 Test Report pdf 4.96 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part23 Test Report pdf 4.86 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part24 Test Report pdf 4.99 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part25 Test Report pdf 5.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part26 Test Report pdf 5.40 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part27 Test Report pdf 5.26 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part28 Test Report pdf 2.63 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part5 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part6 Test Report pdf 4.92 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part7 Test Report pdf 4.85 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part8 Test Report pdf 4.91 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-7 R1 SM-T975 P15.407 U-NII-OFDMA Part9 Test Report pdf 4.84 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 BLE test report Test Report pdf 4.25 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 RF200522K003-3 R1 Samsung Electronics Co., Ltd. SM-T975 P15.247 2.4 GHz WLAN OFD Test Report pdf 2.61 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SM-T975 P15.247 2.4 GHz WLAN Part1 rev2 Test Report pdf 5.42 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SM-T975 P15.247 2.4 GHz WLAN Part2 rev2 Test Report pdf 3.95 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test Set Up Photos (Part 15B CXX) rev2 Test Setup Photos pdf 431.13 KiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 Test report-1 Test Report pdf 2.07 MiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 Test setup photos (JBP) Test Setup Photos pdf 5.61 MiB July 16 2020 / January 12 2021 delayed release
1 2 3 4 5 6 7 RF exposure test report RF Exposure Info pdf 252.64 KiB July 16 2020 / August 18 2020
1 2 3 4 5 6 7 SA200619C19 (RF Exposure WPT TSup Photo) Rev.1 Test Setup Photos pdf 1.02 MiB July 16 2020 / January 12 2021 delayed release

frequency equipment class purpose
1 2020-08-18 2506 ~ 2680 PCB - PCS Licensed Transmitter Original Equipment
2 JBP - Part 15 Class B Computing Device Peripheral
3 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
4 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
5 2412 ~ 2472 DTS - Digital Transmission System
6 859 ~ 894 CXX - Communications Rcvr for use w/ licensed Tx and CBs
7 0.53 ~ 0.53 DCD - Part 15 Low Power Transmitter Below 1705 kHz

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 Effective 2020-08-18
1 2 3 4 5 6 7 Applicant's complete, legal business name Samsung Electronics Co Ltd
1 2 3 4 5 6 7 FCC Registration Number (FRN) 0005810205
1 2 3 4 5 6 7 Physical Address 19 Chapin Rd., Building D
1 2 3 4 5 6 7 Pine Brook, NJ
1 2 3 4 5 6 7 Pine Brook
1 2 3 4 5 6 7 United States
app s TCB Information
1 2 3 4 5 6 7 TCB Application Email Address L******@ul.com
1 2 3 4 5 6 7 TCB Scope B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 7 A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 7 A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 5 6 7 Grantee Code A3L
1 2 3 4 5 6 7 Equipment Product Code SMT975
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 Name J**** C****
1 2 3 4 5 6 7 Title General Manager
1 2 3 4 5 6 7 Telephone Number 973-8********
1 2 3 4 5 6 7 Fax Number 973-8********
1 2 3 4 5 6 7 E-mail j******@samsung.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)01/12/2021
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 Equipment ClassPCB - PCS Licensed Transmitter
1 2 3 4 5 6 7 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 7 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 DTS - Digital Transmission System
1 2 3 4 5 6 7 CXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 7 DCD - Part 15 Low Power Transmitter Below 1705 kHz
1 2 3 4 5 6 7 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Tablet
1 2 3 4 5 6 7 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 Grant CommentsPower output listed is ERP for operations below 1 GHz, EIRP for operations above 1 GHz, and conducted for LTE B26 (Part 90S). LTE supports 5/10 MHz bandwidths in Band 13; 5/10/15/20 MHz bandwidths in Band 41; 1.4/ 3/5/10 MHz bandwidths in Band 5 and Band 12; 1.4/ 3/5/10/15 MHz bandwidths in Band 26; 1.4/3/5/10/15/20 MHz bandwidths in Band 2, Band 4, Band 25 and Band 66. This device contains functions that are not operational in U.S. Territories, including 5GNR; filings under this FCC ID are approved only for U.S. operations. The highest reported SAR for body-worn operation and simultaneous transmission exposure conditions are 0.82 W/kg and 1.51 W/kg respectively.
1 2 3 4 5 6 7 Output power listed is conducted. The highest reported SAR values for standalone and simultaneous transmission exposure conditions are 0.62 W/kg and 1.51 W/kg, respectively.
1 2 3 4 5 6 7 Output power listed is conducted. This device supports 20MHz, 40MHz and 80MHz bandwidths in the 5GHz WLAN band. The highest reported SAR values for standalone and simultaneous transmission exposure conditions are 0.66 W/kg and 1.51 W/kg, respectively.
1 2 3 4 5 6 7 Output power listed is conducted. This device supports 20MHz bandwidth in the 2.4 GHz WLAN band. The highest reported SAR values for standalone and simultaneous transmission exposure conditions are 0.66 W/kg and 1.51 W/kg, respectively.
1 2 3 4 5 6 7 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 Firm Name Bureau Veritas CPS (H.K.) Ltd., Taoyuan Branch
1 2 3 4 5 6 7 Samsung Electronics Co., Ltd. Global CS Center
1 2 3 4 5 6 7 BV CPS ADT Korea Ltd.
1 2 3 4 5 6 7 Name R****** C****
1 2 3 4 5 6 7 P******** N******
1 2 3 4 5 6 7 M******** S****
1 2 3 4 5 6 7 Telephone Number +886-********
1 2 3 4 5 6 7 82-31********
1 2 3 4 5 6 7 +82-7********
1 2 3 4 5 6 7 Fax Number +886-********
1 2 3 4 5 6 7 82-31********
1 2 3 4 5 6 7 +82-3********
1 2 3 4 5 6 7 E-mail r******@bureauveritas.com
1 2 3 4 5 6 7 p******@samsung.com
1 2 3 4 5 6 7 M******@kr.bureauveritas.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 22H 824.2 848.8 0.275 2.5 ppm 250KGXW
1 2 22H 824.2 848.8 0.069 2.5 ppm 250KG7W
1 3 22H 826.4 846.6 0.035 2.5 ppm 4M15F9W
1 4 22H 825.5 847.5 0.044 2.5 ppm 2M70G7D
1 5 22H 825.5 847.5 0.035 2.5 ppm 2M70D7W
1 6 22H 829 844 0.043 2.5 ppm 8M96G7D
1 7 22H 829 844 0.032 2.5 ppm 8M96D7W
1 8 22H 831.5 841.5 0.035 2.5 ppm 13M5G7D
1 9 22H 831.5 841.5 0.028 2.5 ppm 13M4D7W
1 1 9 821.5 821.5 0.239 2.5 ppm 13M4G7D
1 11 9 821.5 821.5 0.205 2.5 ppm 13M4D7W
1 12 24E 1850.2 1909.8 0.437 2.5 ppm 246KGXW
1 13 24E 1850.2 1909.8 0.214 2.5 ppm 245KG7W
1 14 24E 1852.4 1907.6 0.166 2.5 ppm 4M16F9W
1 15 24E 1855 1905 0.074 2.5 ppm 8M96G7D
1 16 24E 1855 1905 0.06 2.5 ppm 8M96D7W
1 17 24E 1860 1900 0.071 2.5 ppm 17M9G7D
1 18 24E 1860 1900 0.055 2.5 ppm 17M9D7W
1 19 24E 1860 1905 0.066 2.5 ppm 17M9G7D
1 2 24E 1860 1905 0.051 2.5 ppm 17M9D7W
1 21 27 1712.4 1752.6 0.065 2.5 ppm 4M16F9W
1 22 27 1715 1750 0.034 2.5 ppm 8M96D7W
1 23 27 1720 1745 0.043 2.5 ppm 17M9G7D
1 24 27 1720 1745 0.033 2.5 ppm 18M0D7W
1 25 27 699.7 715.3 0.055 2.5 ppm 1M09D7W
1 26 27 704 711 0.071 2.5 ppm 8M96G7D
1 27 27 704 711 0.051 2.5 ppm 8M96D7W
1 28 27 782 782 0.085 2.5 ppm 8M93G7D
1 29 27 782 782 0.066 2.5 ppm 8M93D7W
1 3 27 2506 2680 0.063 2.5 ppm 17M9G7D
1 31 27 2506 2680 0.051 2.5 ppm 17M9D7W
1 32 27 1720 1770 0.078 2.5 ppm 17M9G7D
1 33 27 1720 1770 0.062 2.5 ppm 18M0D7W
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C CC 2402.00000000 2480.00000000 0.0200000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15E CC MO 5180 5240 0.119
4 2 15E CC MO 5260 5320 0.122
4 3 15E CC MO 5500 5720 0.101
4 4 15E CC MO 5745 5825 0.121
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15C CC MO 2412 2472 0.191
5 2 15C CC 2402 2480 0.002
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 15B CC 859 894
6 2 15B CC 729 756
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15C CC 0.53000000 0.53000000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC